Well this is how the boat was dropped off.

Name:  Before and After 1.jpg
Views: 124
Size:  152.8 KB

This is a very nice Bumble Bee all Coosa built boat. Being a single console there is a nice and wide area is on the Port side to lay down your jig poles.

Name:  Before and After 2.jpg
Views: 119
Size:  111.1 KB

After being in the shop for a hour we were well into the job. I wish I took a before & after picture of his carpet right under the hydraulic steering helm as it was a mess. The owner wanted to cut the carpet out writing it off as forever ruined but a 30 second wipe with the paint prep cleaner I use and the carpet looked like new. His Hot Foot was really nasty too so while I had it out I showed my bud the fish cleaning station and handed him a can of Gunk Foamy and a small stainless wire brush.

The boat is here for re-wiring and updating the plumbing. Some cosmetics may be addressed after the work is done. The Bunks need new carpet too. The Cowl on the engine had the decals on the back peeling off so I removed the balance of the decal & remaining glue then used my Rupes Polisher to return the Cowl to a factory new shine.

Some electronics wiring upgrading is happening too as well as relocating the GLS-10 box to a higher airflow area.

This is a type of Bass Boat that you must remove the Fuel Tank to access some of the plumbing connections. So the tank is out. Also Oil Tank relocation, Battery reconfiguration, and a new Tongue Jack too. The bow raised Dual Electronics mount is one of my creations I made about 4 years ago. It gave great strength and spanned the Recessed Foot Control Pan. More later.