After almost 3 months of waiting for the Trusses I ordered they were ready for pickup Monday. I hit the road to North Pensacola and picked them up. Instead of replacing the portable dry parking & storage canopies I'm enclosing a side yard next to my shop.

Name:  Tornado Repairs Ongoing 1.jpg
Views: 1861
Size:  122.6 KBName:  Tornado Repairs Ongoing 2.jpg
Views: 1880
Size:  155.9 KB

The Trusses are engineered for 10ft spacing & 120MPH winds. Also they are intended to be attached to 6x6 timbers. I went 8x8 Marine Treated Timbers and 8ft Truss spacing.

Name:  Tornado Repairs Ongoing 3.jpg
Views: 1876
Size:  150.1 KBName:  Tornado Repairs Ongoing 4.jpg
Views: 1894
Size:  130.6 KB

16 footers are going next to the red building and 12 footers out to the fence. My design is to float the roof next to the building and use Z-Flashing to prevent water from blowing back under the eve. I will be sinking these so they will never pull out the ground.

The Greenhouse will meet "The Demo Man"!

Name:  Tornado Repairs Ongoing 5.jpg
Views: 1874
Size:  108.0 KB

Time to turn the page on this, I'm tired of looking at this bent up mess. As soon as the new dry parking is finished this greenhouse is Toast.