It'll take about an hour or two to take off and put on other boat. Toughest part is lining up the control cables, main wiring harness, and fuel lines ,through the rigging boot. Those boots on the front of the engine are a pain. The rest is easy. 4 bolts off and 4 bolts on.
Sent from my iPad using Tapatalk


Likes:
Thanks:
HaHa: 



Reply With Quote
















