The 3/4" metal conduit goes to a 50 amp GFCI box outside. The 1/2" metal conduits go to two 20 amp GFCI's outside (one out front and one out the side). The 1 1/4" metal conduit ties to my main breaker box with a 100 amp feed. The blank (empty) 1 1/4" metal conduit runs below the house for another feed if I need it. All my sub panels in different buildings/addition (four in all) work on this same principle so conceivably, I can continue adding on without any major obstacles.
Thanks you guys for all your comments![]()


Likes:
Thanks:
HaHa: 




Randy Andres
Reply With Quote















