Yes, and from the looks of it Saturday it will be several more days. Looks like the parking lot is done but the dock and hardware (rails, cleats, etc.) have a long way to go. Four-wheel drives can still put in at the airboat ramp. I've been putting in at Mullet Lake. Takes about 25 minutes @ 35 MPH to get to Harney, but it's a very nice ride.