Talked to one of the construction hands today. They are extending the length of the pier from 35 to 50 feet. Also adding an “L” shaped dock on the side facing away from the bridge, plus some sort of launch for the kayakers. Should be done the first week of April.


Likes:
Thanks:
HaHa: 


Reply With Quote
















