
Likes:
0

Thanks:
0

HaHa:
0
-
Gives me an ideal, a lot of the spring time action is very shallow 3' and less, I may take some pallets and cut them in halve making the triangle so the top is below the surface. Taking off the lowest plank will proably be good. May remove a couple planks off the lower pallet so fish can get at the bottom, maybe even dump a little sand and pea gravel where I remove the planks. This weather is so lousy I think I will build a half dozen this weekend.
Posting Permissions
- You may not post new threads
- You may not post replies
- You may not post attachments
- You may not edit your posts
-
Forum Rules
BACK TO TOP