made some progress the last couple weeks here some pics.

Floors tore out and foam tore out....





The transom has been removed, the two boxes on each side that were foam filled, and all the bilge/ livewell pumps have been removed.





I have cleaned up all the edges with the grinder where new wood will be glassed in and am currently running a wire wheel over all glassing surfaces in the boat. I knew this prep work would take the longest time and it has took a good couple weeks on this part but when I get through with the wire wheel, I will vacuum everything real good and then take it out to the pressure washer and clean up real good, put back inside and run a fam on everything for at least a week to dry it all back out. I have a lot more done since these pics I am posting now. More pics to come soon.CF