
Originally Posted by
fatslab
after spooling up with new line,tie off end and walk back about half a spool and stretch new line,good time to set drag,lay rod down and walk back and untie before winding in.
This is the way I do it..
USS Intrepid CVS-11 Helicopter Squadron-3 1960-1964
When I keep my gratitude higher than my expectations I have a good day