Finally getting finished with a 2 year project to stabilize the dam and reline the outflow pipe. Maybe with the fixes we can get back to a normal operation of the dam. The levels have either had the bottom sucked out or running over the top because of flooding. Name:  FB_IMG_1516300290376.jpg
Views: 925
Size:  109.0 KBName:  FB_IMG_1516300266382.jpg
Views: 889
Size:  80.3 KBName:  FB_IMG_1516300305508.jpg
Views: 915
Size:  80.5 KBName:  FB_IMG_1516300316077.jpg
Views: 907
Size:  76.0 KB

Sent from my SM-G930R4 using Tapatalk