The drywall crew will be here Thursday morning, I hope, and the tape&bed, texture fellow will follow them that evening after they are done and get started on finishing the walls.

He should be finished by the first of next week and then I can install the electrical receptacles and light switches. I will primer/seal the new walls, then paint them before hanging the light fixtures and ceiling fans.

While these guys are doing the drywall, I will be under the house connecting all my drain lines to my sewer system. I might want to take a bath..........eventually.:rolleyes:

Later in the month I will start building my kitchen cabinets and bathroom vanity. After they are finished, I will install the flooring, trim, and door stops.

I hope to be totally finished by the first of June. Wish me luck!