While most of you have been tearin em up during the spawn, I've been working on my cabin. Looks like I will miss the best part of the spring spawn.........sigh:o
But I have made progress and plan to be living in my cabin by the end of the month. Here's some pictures of my latest progress;
http://img.photobucket.com/albums/v2...ewcabin060.jpg
The picture above was taken to give an idea of how high this cabin sets off the ground. I had to build scaffolding (see picture below) in order to be able to install the windows.
http://img.photobucket.com/albums/v2...ewcabin059.jpg
The picture below shows the back of the water manifold and the breaker box with all the wiring.
http://img.photobucket.com/albums/v2...ewcabin041.jpg
The water manifold is convenient for being able to control each unit requiring water independently. Hot or cold, if you want to turn the water off to a sink or the tub, you do it at the central location and all the rest of the plumbing in the entire house can remain open and in use.
http://img.photobucket.com/albums/v2...ewcabin038.jpg
http://img.photobucket.com/albums/v2...cabin040-1.jpg
http://img.photobucket.com/albums/v2...cabin044-1.jpg
This is a shot of the bathroom entrance and the door to the right is to the utility room which will double on occasions as an extra bedroom for the grandkids.
I've got some more pictures and will add them as I have time, but for now, back to work. Thanks for taking a moment and looking at the progress made thus far.:)