Likes Likes:  0
Thanks Thanks:  0
HaHa HaHa:  0
Page 3 of 3 FirstFirst 123
Results 21 to 23 of 23

Thread: First build with the saw

  1. #21
    Join Date
    Aug 2008
    Location
    Hernando, Ms
    Posts
    10,160
    Post Thanks / Like

    Default


    A sheet of plywood over the slats, no more worries.
    Carl's Guide Service
    Sardis Lake
    Enid Lake
    Grenada Lake
    901-734-7536

  2. #22
    Join Date
    Feb 2011
    Location
    Senatobia ,MS
    Posts
    2,207
    Post Thanks / Like

    Default

    Put it on the floor no more worries.
    Single pole mafia

  3. #23
    Join Date
    Oct 2008
    Location
    Brandon, Mississippi
    Posts
    27,484
    Post Thanks / Like

    Default

    We had the mattrace on the floor at the other house. Took the frame and put it in storage when we were putting in the new carpet. Momma wanted a new bed and momma got one Loki got it all fixed now. Couple 1x4s at the end and a couple running from top to bottom. I put 2 screws in every cross slat. It ain't going no where now with all 56 screws in it lol
    proud member of "Team Cup"

Page 3 of 3 FirstFirst 123

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  

BACK TO TOP