May I would suggest a clean out bushing with plug flush mounted with the floor installed with a T to join the main line and a length on SCH 40 to bring it to floor level? Sure would help if you have a future backup.
Yes that is the plan. Hopefully won’t be in this house too much longer, but I’m sure next owner will appreciate it