Likes Likes:  0
Thanks Thanks:  0
HaHa HaHa:  0
Page 3 of 3 FirstFirst 123
Results 21 to 22 of 22

Thread: Stymie...we're waiting....

  1. #21
    Join Date
    Jul 2009
    Location
    Madison, Alabama
    Posts
    1,232
    Post Thanks / Like

    Default


    regards tracking your changes when working with code. we doit in the automation industry.
    Team "Itch N 2 Fish"

  2. #22
    Join Date
    Jan 2012
    Location
    GA
    Posts
    160
    Post Thanks / Like

    Default

    Sorry, right Software Configuration Management (SCM). When a development team loses "control" or knowledge of the changed pieces that work together without issues what we have right now is a common result. Same goes for changing a piece that affects other features/pieces, if you lose track then this kind of thing happens.

Page 3 of 3 FirstFirst 123

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  

BACK TO TOP