I am going to build several pvc condos to drop in my slip.

I have been thinking about taking a 8' 3" pvc pipe and drill holes in it every 6", at different angles on the pipe.

I would then install 8" 1" pipes in the holes, making each leg 4' long.

Since my slip sets in 10'-11' foot of water I would place these units on the bottom of my slip, which would give me about 3' of water for the motor to clear the pvc unit.

This would place an 8' horizontal section of pipe along the bottom of the slip, with 4' legs coming off the pipe at different angles.

Do you think this would work?