Likes Likes:  0
Thanks Thanks:  0
HaHa HaHa:  0
Results 1 to 4 of 4

Thread: staking down structure in current

Threaded View

Previous Post Previous Post   Next Post Next Post
  1. #1
    Join Date
    Feb 2008
    Location
    Albany, LA
    Posts
    1,048
    Post Thanks / Like

    Default staking down structure in current

    I saw some guys talking about keeping structure still in rivers and areas with current.
    Here is what we do.

    Insert a piece of PVC pipe in the bucket of concrete with a hole at the bottom so the PVC acts as a collar running thru the center.

    Insert 8-10 stalks of bushy bamboo tips or whatever you use into the concrete around the pvc pipe, let it dry

    Take an 8 or 9' piece of bamboo stalk (stout) and drive it thru the collar at the time of sinking with stake driver.

    I usually drive the stake 5' into the mud and let 3 or 4' stick up above the pvc collar.

    These are in 15ft of water in the river, staked down. Works great.

    Hope this helps someone.
    Attached Images Attached Images      

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  

BACK TO TOP