Name:  Croaker Tank Conversion 12.jpg
Views: 260
Size:  53.1 KB

Turning the Tub right side up first lids for paint mixing containers had the rims removed with scissors so they would lay flat. Then we tape the flat lids over the Jet holes from the inside reinforcing all the lids with either more mixing containers or paint sticks taped over everything else. This is to prevent the gelcoat from running outside of the area we want to fill, prevent any air from reaching the gelcoat for a fully cured final product, and provide a very smooth - slick inside finish.

Name:  Croaker Tank Conversion 16.jpg
Views: 233
Size:  58.8 KB

Using Visqueen as a release material to work the reinforcement saturation on all the fiberglass mat was cut out first, stacked as needed, then fully saturated with resin.

Name:  Croaker Tank Conversion 10.jpg
Views: 252
Size:  49.9 KBName:  Croaker Tank Conversion 11.jpg
Views: 240
Size:  54.3 KB

After flipping the Tub back over and applying a very liberal coat of gelcoat (numerous applications till the gelcoat started to cure) the saturated reinforcement mat was applied over the holes and allowed to cure.

Name:  Croaker Tank Conversion 15.jpg
Views: 242
Size:  53.6 KBName:  Croaker Tank Conversion 14.jpg
Views: 235
Size:  42.0 KB

This picture shows the Gelcoat applied, you really lather it on for a very good seal to the existing substrate.

Name:  Croaker Tank Conversion 13.jpg
Views: 242
Size:  18.8 KB

The first holes were unmasked to reveal our plug job. If I had white gelcoat laying around it would have been used but all I had was this gray (freebie job) but the gray gelcoat really shows how well our job came out.