-
While not completely finished with the former bathroom, having only completely gutted, rewired ( 2 new GFI plug ins, 2 new lighted switches, a new high volume shower fan/ light ), removing a previously leaking and beautifully fully self frosting over ( winter time only, thankfully ) exterior window and successfully boarding its hole up as well as completely insulating that wall, leveling the old tub she insisted on keeping, as well as installing individual shut off valves for said tub/ shower and a new hot/ cold 2 knob valve body, securing the previously loose shower pipe and then hanging green/ blue board rather than the cement board would have rather used next to the tub, the muddying the whole thing, every @#$& seam apparently she got tired of having to do dainty things in the still unfinished and still wreckage strewn area closely resembling the Stalingrad battleground. She has decided my muddying and sanding efforts closely resemble those of a ten thousand strong herd of bison running at full gallop across a marshy area to put it politely. When politely challenged she did indeed do a fairly decent corner but the tape ( personally insisted on mesh, but hey, what do I know, right?) wasn’t having it and alas didn’t docilely adhere and stick, instead reading up a considerable distance on the 1 side. So, she’s hiring the rest out… i yield to her decision
Tags for this Thread
Posting Permissions
- You may not post new threads
- You may not post replies
- You may not post attachments
- You may not edit your posts
-
Forum Rules
BACK TO TOP