
Thanks:
0

HaHa:
0
-
Thanks to those who sent PM's or posted up on the forum. It assisted me in getting this project completed about two weeks ahead of time. Which will allow me to crappie fish on 4/17 when others will be scrambling to get their projects done.
For those that want to know. the Mean average was 8.6, Standard Deviation was 3.2. 99th percentile confidence level was 6.99 <x< 10.2. It all worked perfectly.
Tags for this Thread
Posting Permissions
- You may not post new threads
- You may not post replies
- You may not post attachments
- You may not edit your posts
-
Forum Rules
BACK TO TOP