HaHa HaHa:  0
Results 1 to 10 of 14

Thread: Butla done?

Hybrid View

Previous Post Previous Post   Next Post Next Post
  1. #1
    Join Date
    May 2006
    Location
    Horn Lake, MS
    Posts
    9,566
    Post Thanks / Like

    Default

    I was talking to Scoot and June about this last night. If the road washes out again they won't rebuild it. Years ago they built a bridge across the overflow. A road is being built across the model airplane field to the bridge on the north end. It was gravel the last time I was through the area.

  2. #2
    Cray's Avatar
    Cray is offline Crappie.com 2019 Man of Year, Supermod & Moderator of the Mechanics Forum * Crappie.com Supporter
    Join Date
    Oct 2010
    Location
    Byhalia,Mississippi
    Posts
    17,343
    Post Thanks / Like

    Default

    Quote Originally Posted by canebreaker View Post
    I was talking to Scoot and June about this last night. If the road washes out again they won't rebuild it. Years ago they built a bridge across the overflow. A road is being built across the model airplane field to the bridge on the north end. It was gravel the last time I was through the area.
    Problem is, last time I talked to them the new road would not be completed until sometime this fall. And with the bridge closed on 51 lots of people are having to use that rd to get to memphis.
    Proud Member of Team Geezer
    Charlie Weaver USN/ENC 1965-1979




Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  

BACK TO TOP