Quote Originally Posted by wilbur View Post
Wow that was quick.
There was less damage to the remainder of the bridge than was first thought. They were able to build the 332 foot span off-site and raise it up into place. Great work by the Hall Contractors.

wilbur, I see the pic of the jet dragster at the bottom of the post. The guy who has the Crossfire jet dragster is very near my shop. Never seen it run.