
Likes:
0

Thanks:
0

HaHa:
0
-
When I get into a rhythm and have stuff set out for a style I will crank out 6 usually before I switch to something else. Once I get rolling I can get a set of 6 jigs done in about 15 minutes. When I usually get the stuff out I will tie for an hour or so. In that hour I usually switch it up a couple times and can end up with 18-24 jigs. I am fairly new to tying but I have found that it takes me longer to decide what I want to tie and get everything laid out and ready to go than it does to whip out the jigs.
Tags for this Thread
Posting Permissions
- You may not post new threads
- You may not post replies
- You may not post attachments
- You may not edit your posts
-
Forum Rules
BACK TO TOP