
Originally Posted by
K9jones
Hey Guys
How many pvc structures (cement block type) do you normally put at a location?
Thanks,
K9
I make some with 5 gallon buckets and 3 gallon buckets. Put about 10 to 12 pieces of PVC in the 5 gallon buckets and put about 4 to a spot spaced out about a boat length apart. The smaller ones have 4 to six pieces in them and have put out as many as 20 on one spot. Put the ones in open water out in a square formation. Put ones out on a ledge on a river channel in a T formation with part of the formation going down the drop off. Also mark about 4 waypoints on gps and go through the middle of them when getting back on stucture. this will put you back on it everytime. CF
The Original Woodsgoat Hater
2011 NWR Bash Yellow Perch Champion