We built a couple pvc structures this weekend and put about a foot of 'crete in bottom of the main (5' x 5") pipe. They're probably not going to stand up straight for long, but that's okay. We're putting long "branches" at the bottom to keep them standing at an angle at least. They're definitely heavy enough to sink fast.