Quote Originally Posted by dko View Post
The last time I was there it was during drawdown. Sure doesn’t seem like that long.
2016 so be 4 years . Think it was schedualed 2015 but floods postponed drawdown . Are they trying to get back on schedule ? I thought it was every 5 years plan .