Russ that would be us in District 10 (Tom, Matt, and I). A lot of planning goes into a drawdown. We like to accomplish as many projects as possible when the water is down. The most bang for the buck. We have several projects that we would like to get accomplished during a drawdown: fix boat trails including removing some stumps, dredging certain areas of the lake, and replacing the dam with a spillway. I don't know when the next drawdown will be. We would like to wait to do a drawdown when we could accomplish those three goals. That more than likely won't happen. More than likely we will be able to work on the boat trails and stumps on the next drawdown. Dredging and replacing the dam will cost some serious cash. This will need by in by our Administration and the Commisioners. I will be sure to inform y'all as some as I know for sure that we will be having a drawdown.


Likes:
Thanks:
HaHa: 


Reply With Quote















