Been working on the boat for a while between duck hunting. I've got maybe a bag or 2 of crappie left. This means I gotta hurry.
Bent up some aluminum and custom made some wareagle brackets to get the driftmasters off the floor. Moved the older transducer to the front and routed the cable through the groove in the Terrova shaft and tested it on the water to make sure it was interference free. Made a custom bracket for the 718 unit to get it off the floor. Relined all the jig poles but haven't got the cranking rods done yet (figured that could wait until last). Got about 8 or 12 hours left till the finished product and then FISHING TIME!.
Here is a pic of one of the brackets while checking the fit. I do have the finished product mounted but no pic.


Likes:
Thanks:
HaHa: 


Reply With Quote















