2 Attachment(s)
Thoughts before I pour concrete and cut
Here are 2 buckets I put together today. All the materials I had laying around and was going to get thrown away some time soon. The tubing is from some garden/flower bed sprinkler systems that had pieced left. The buckets j got from work. I plan to let the crete set and then cut the middle of thw tubing loops. The crete will hold the tubing in and upright, and will only go past the tubing an inch or so. I plan on putting the lids on with aome holes in them for smaller critters to get into. I also have a 25' water hose to add to the tops .
Dont really know where to set thwm either. I dont fish often and tbe places I do fish near me, i dont realy know of any good spots. I might put them near a pier at a camp I go to every year on vacation, but it is 4 hours away. Was thinking about making a long day out of it. Attachment 296555Attachment 296556
Sent from my SAMSUNG-SM-G891A using Tapatalk