5 Attachment(s)
More updated pictures of project.
On the downhill side and actually replacing the guts of this project. With the cooler temps and rain, this project will be cut short and some of the improvements of a larger livewell and bait tank, and a updated steering console with instrument panel will be postponed until summer 2010. I just want to fish some this year. Thanks for looking and wish me well. Rollcaster..............
3 Attachment(s)
Here's what I accomplished this weekend.
I wanted to install the steering console and throttle controls this weekend and here are the pictures for it. Thanks for looking.
2 Attachment(s)
It's all coming together!
Just a few more weeks and I'll be on the water if everything goes as planned. The boat is starting to look functional and nice. It is nice to have the picture in your mind and the final product match at the end. I have carpeted the sides of the center and front section and have cut the floor for the front deck. I finished the outboard this week with new water pump, new shift rod, and new prop. It's ready to be installed when time is ready. I know if I put it on now, I'd be on the water with a rod and jig; so I'll wait until everything else is done. Thanks for looking and weather premitting, I'll be finished soon. Rollcaster...........................