Went to Mizzou for Neices wedding yesterday. Been running some pipe in the boat for the bilge and areators. Everything is 3/4" schedule 40 pvc and reinforced 3/4" hose. I ran the rigid pvc everywhere I could so as not to have a hose close up on me where I couldn't reach it without tearing something out.
The front livewell I built sits too low to be able to drain it like a normal livewell. I have chosen to run a drain line towards the back connected to a shutoff valve then a Tee, the down to the bilge pump. The other side of the Tee has another shutoff valve then has a capped end with holes drilled on the underside to act as a recirculator to areate the water. The inflow comes from the areator at the back of the boat (with inline shutoff) and a 90% turned down to simply fill the livewell. I must be carefull to not leave the areator on too long or I will overfill the livewell. I have a float switch I might connect to the bilge pump to drain or am considering an audible alarm (quiet) to play while the areator is running.
Here's the pics, you can figure out what's what.
http://i248.photobucket.com/albums/g...lumbing018.jpg
http://i248.photobucket.com/albums/g...lumbing014.jpg
http://i248.photobucket.com/albums/g...lumbing015.jpg
http://i248.photobucket.com/albums/g...lumbing016.jpg
http://i248.photobucket.com/albums/g...lumbing019.jpg
I'm short one cap on the areator line in the Starboard livewell, but will pick one up tommorrow.
Next job is to figure exactly how many switches, wires, and what not is needed, then to get the rough in done on Electrical. Only then can I cap off the front deck and start final Metal work. I'll be very lucky to be able to lay some carpet this week. I am really trying to push this thing so I can make the Eufaula gig. Wish me luck!

