What's Going On At Shenango Lake
LAKE INFO FOR FRIDAY, MARCH 26:
Lake elevation: 888.62, 6 ft below summer pool
Gate Settings: Gate 4 is open to 1 ft
Outflow depth: 2.21 ft
River depth at Transfer: 2.27 ft
7 am air temp: 64
7 am river water temp: 48
Weather: drizzle/high wind
24 hour precip: .01 inch
Shenango Recreation Area and Route 18 Access Area will be closed to the public beginning March 29th.
Extensive road work in the campground is planned to begin which includes milling and asphalt paving, and will prohibit vehicle and foot travel within the area. Route 18 Access area will be closed for crew and visitor safety. The millings from the road work will be used to improve the access road at Route 18 Access.
The closure will not extend beyond May 13 and the area will be reopened as soon as possible. The other boat launches, including the Mahaney and Clark launches, will still be open to the public.
The campground is still scheduled to open May 14 as originally planned.
Any impacts (if any) to Earth Day activities will be assessed closer to April 24. We apologize for the inconvenience but look forward to improving our facilities for the public. Thank you.