Got the charger mounted, batteries in place, shift lever contol box back mounted, shift lever trim switch installed, wires run and tied down, and charger plugged in!!! Trim switch works. Next the front of the boat and mount the ff.
Printable View
Got the charger mounted, batteries in place, shift lever contol box back mounted, shift lever trim switch installed, wires run and tied down, and charger plugged in!!! Trim switch works. Next the front of the boat and mount the ff.
Hope he doesn't work by the hour, haha
Donna do that?:biggrin
Donna didn't want me too but did anyway lol.
[QUOTE=KDAVID1;3230376]Donna didn't want me too but did anyway lol.
Darn! Forgot the smiley.:ThumbsUp:ThumbsUp
Donna got a holt of it :)
And she's done. New ff mounted, front panel back in place. Good to go, hopefully back on the water this weekend!!!