Lowrance instructions bite.
Ok. I've got the new HDS 7 installed with the SS.
I also have the HDS 5 installed up front and not networked together. Yet.
I pulled all my data (waypoints) off my old LMS 332 onto a SD card finally and now don't have any idea how to move it to my new 7. There is nothing in the book I've found to tell me how to do this.
Do I just stick the card in and turn the unit on?
Here comes some more.
I'll be connecting the 5 to the structure scan also as soon as the cable arrives.
Both the units and Structure Scan are connected to the same power switch. The yellow (wake up) wire on the 7 and SS are connected together. This all works fine.
My question is. Do I also have to connect the yellow wire from the 5 ?
My plans when I get this all buttoned up are to switch the 5 & 7 on the same switch. Then switch the SS seperately so I don't have to have that running at all times.
What's your thoughts?
There will be more questions, I'm sure.
But for now, I thank you.