Brush line to a crick channel or spotted cover along the way?
I have a dock that at its deepest point at normal pool sits about 16-18' deep. I have a creek channel that runs out in front of the dock about 40' that is about 60' deep. I have my dock pretty well loaded with brush.(hanging cedars and sunkin cedars) My question is I have enough trees to sink a line from the dock to the creek channel. Do I sink a continuous line of cover, or sink individual piles along the way? Any advice would be helpful. Great sight by the way. Thanks