Cause it is above the curve for flood control. Here is the link that was posted the other day.
U.S. Army Corps of Engineers -- Vicksburg District
Likes: 0
Thanks: 0
HaHa: 0
When we desperately need another 5 or 6 feet of water as it is?
It's CRAPPIE season!!!!!!!!!!!!!!!!!!!!!!
Cause it is above the curve for flood control. Here is the link that was posted the other day.
U.S. Army Corps of Engineers -- Vicksburg District
1990 Stratos 285 Pro 200 HP Merc
SpyderLok Rod Holders
Proud Member of Team Watch The Finger!!!
(662) 458-8925
Me either but they have NO intensions of it going over the emergency spillway.
1990 Stratos 285 Pro 200 HP Merc
SpyderLok Rod Holders
Proud Member of Team Watch The Finger!!!
(662) 458-8925
We are just 30 feet from going over it now.
No I understand, but when it's this low, a couple feet ain't going to make much difference.
It's CRAPPIE season!!!!!!!!!!!!!!!!!!!!!!
Tell thaat to the folks at Butla, dont remember what the 72 hour rise was but it was rediculous. 12 inches of rain ina little over 24 hours up river was tuff.
1990 Stratos 285 Pro 200 HP Merc
SpyderLok Rod Holders
Proud Member of Team Watch The Finger!!!
(662) 458-8925
I checked the plot and it looks like it came up 8 foot, a heck of a rise.
I am not that familiar with Butla, but doesn't a big rain make it jump pretty fast?
It's CRAPPIE season!!!!!!!!!!!!!!!!!!!!!!
Butla can jump up pretty quick depending where the rain falls, if there is 2in rain NE of HERNANDO in the coldwater water shed you can expect a 3 -4 or higher jump in Butla.Dont take a lot cause the lake is so shallow.
PROUD MEMBER OF TEAM GEEZER
BUTLA ROSE OVER 7 FT IN A 3 DAY PERIOD SINCE FRIDAY BEFORE LAST. On slow fall now!!
OLD GEEZER FISHERMEN NEVER DIE, THEY JUST SMELL THAT WAY!!