Likes Likes:  0
Thanks Thanks:  0
HaHa HaHa:  0
Results 1 to 6 of 6

Thread: Planning Building Conversion.

  1. #1
    Join Date
    Jan 2008
    Location
    Ohio , Berlin Center
    Posts
    841
    Post Thanks / Like

    Default Planning Building Conversion.


    Going to commit the back third of one of my outbuildings to TYING. As some of you know I tie in an outside unheated garage. Winters have always played havoc with me.

    I do ice fish so while not impervious to the cold I do have a high tolerance for it. But I ain't getting no younger. So while I was outside the other day the idea kinda hit me.

    My back building is already wired for electricity. In the back it has a drop ceiling for above head storage. I figure I will have about an 8 X 16 foot room dedicated to pouring , painting and tying jigs. I will only have to erect one wall and install a door in the wall to complete this.

    Building it will be the easy part. Getting my other junk and stored out of the way will be the majority of the work. Hope to be done before lakes open up up here. MAGNUM MAN CAVE HERE I COME.
    Garminarmin gpsmap 1040 xs networked with Garmin gpsmap 1242 xsv , Panoptix PS 30 and PS 31. Livescope LVS 32

    Ice rig Echomap Ultra 106SV with LVS 12 and GT10-IF

  2. #2
    Join Date
    Feb 2009
    Location
    West Virginia
    Posts
    3,254
    Post Thanks / Like

    Default

    post pics!!!

  3. #3
    azslabber's Avatar
    azslabber is offline Crappie.com 2K Star General * Crappie.com Supporter
    Join Date
    Oct 2009
    Location
    Pennsylvania
    Posts
    2,473
    Post Thanks / Like

    Default

    Oh,your wife will know where you are if she can't find you now,lol.
    "Garden Hackler"lol

  4. #4
    Join Date
    Apr 2009
    Location
    Poynette, Wisconsin
    Posts
    799
    Post Thanks / Like

    Default

    You go for it buddy!! You'll find that it's a lot easier when everything is
    right at hand and if ya put in heat, you're good for all year! Im fortunate to
    have 2/3 of a heated basement dedicated to rod building, lure making, pouring, painting and tieing jigs. The wife uses part of it for her flower creations, but we have plenty of room and use it constantly summer and winter. I'd be lost without it. Hey, we're not gettting any younger, time to
    enjoy the time that's left by doing the things we like!!!!!!
    Enjoy!!
    Crappiekiller3

    Sittin here wishin I was out fishin!!!

  5. #5
    skeetbum's Avatar
    skeetbum is offline Crappie.com Legend - Moderator Jig Tying Forum * Crappie.com Supporter
    Join Date
    Dec 2007
    Location
    Tennessee
    Posts
    24,426
    Post Thanks / Like

    Default

    Remember ventilation if you're working with lead inside. Post pics. I work inside and don't pour my own. I have enough other addictions, maybe later.
    Creativity is just intelligence fooling around

  6. #6
    Join Date
    Oct 2005
    Location
    Grand Rivers,Ky.
    Posts
    2,566
    Post Thanks / Like

    Default

    Hays47,
    I can't stress enough about the importance of proper ventilation. I have friends in the buisness and they get checked for lead in there blood and the winter months it really shows up.Lead is some bad stuff in the wrong places.I always pour with ventilation and always wash my hands after handling anything lead. I am working on a powder paint both. That stuff goes everywhere. Hope your jig-cave turns out great !!!!
    Life is Good !
    2018 Kentucky & Tennessee Crappie Masters State Champs!

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  

BACK TO TOP