take 3in pvc cut in 5ft section. drill 3/4 in holes through them about 2 ft apart all the way down. pour concrete in bottom 1ft or 2 first. then cut 3/4 pvc 4 ft long. Take zip ties and zip them on 3/4 pvc about 2ft down. When you get to lake slide them through the holes in the 3 inch and zip tie other side of 3/4 in. Drop them and they ll stand up fine, if they turn over they wont go far.


Likes:
Thanks:
HaHa: 
Reply With Quote

















