Likes Likes:  0
Thanks Thanks:  0
HaHa HaHa:  0
Results 1 to 10 of 16

Thread: Boat project step 1.....

Threaded View

Previous Post Previous Post   Next Post Next Post
  1. #1
    Join Date
    Mar 2010
    Location
    Ward,Ar.
    Posts
    1,571
    Post Thanks / Like

    Default Boat project step 1.....

    Well, I have confirmed all of the mechanical features. Now it's time to add all the goodies for step 1. Added new spare tire and mount, eagle gps color graph, tilt trim at steering, 8 pole storage/travel track for spider rigging poles, new drift masters T-250h's. Next is new matching high back camo seats. Then load her up with Midsouth tackle and ozark rods and test her out on an official maiden voyage!

    What do y'all think so far?
    Attached Images Attached Images       
    Midsouth Tackle Pro Staff
    www.midsouthtackle.com
    Ozark Rod Pro Staff
    Cumberland Crappie Equipment Pro Staff
    www.cumberlandcrappie.com

    You can contact me at:1-501-231-3374

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  

BACK TO TOP